Monday, October 26, 2009

The Mud Lobster Takes a Holiday

Dear Friends
Just to let you know that I'll be out of Thailand for about a month, on leave in the UK. So the postings will slow, somewhat. But please feel free to get in contact. The email will be checked every so often.
Happy digging.
D

Wednesday, October 7, 2009

Mangrove Rehabilitation in Colombia

http://www.youtube.com/watch?v=zML6FA22CnQ

This is a link to a youtube video. Please follow and watch the 6 minute film. It documents mangrove work by Prof Heliadoro Sanchez in Colombia. There are some interesting parallels with Bang Lang Da. An amazing man.

Friday, October 2, 2009

Deep and Wide and Painful

So, what's been happening down in the mud? A previous entry has described the visit from Japan, organised by the Ramsar Centre of Japan. Thrilled to say that now my MSc is completed (mid Sept). So for the last few weeks a lot of digging has been committed, and the plant data have been charted (next blog). As per a previous update what Jim and I discussed doing was widening and deepening the start of the main channel (2) from the sluice gate across the centre of the pond. This has been done, and produced some more hills, including A2, B2 and D2 (yes, we've gone round the alphabet already). Much has been learnt during this process. It's been hard slow work as the channel is already quite deep. Thus taking the sides back and sloping them over means shifting a huge amount of soil. Often there are a series of drainage holes on the surface near the edge of the channel. These holes mean that any soil below is not going to be that strong or stable. Therefore the subsoil has to be dug out. The implication of this is that sometimes the sides of a channel have to be lent right back to remove this unstable soil, (ie a LOT of digging) and to keep the weight off what is left. Otherwise the sides of the channel collapse inwards. The picture below is looking up the channel, which I was standing in at the time of taking this picture. At the top is what the original channel looks like, unaltered. The pool in the middle is an example of the excavation, the new channel floor being two feet lower than the current channel bottom. Near to me, the sides have collapsed inwards.
The soil itself has a very high clay content. Often it was possible to cut pieces out like blocks of cheese.
There have also been some amazing colours in the clay; yellows, light blues and reds. Though this might look like strata of sand, a 'finger test' of the coloured material revealed that it had the same consistency as normal clay.

Needless to say, because this channel is the lowest point on the site, it could only be worked at the lowest tides. It is only possible to work from the sluice gate upwards, not working downstream. However, because the total volume of water leaving the pond during any one tide is not great, the bottom of these new channels becomes filled with very fine silt and clay, rather than being scoured by the movement of the water.
When the tide was too high to permit work in Channel 2, a new branch (2D) has been excavated. 2 denotes that it drains into the main channel running across the pond. D as it's the fourth sub-channel to be created. 2D has been excavated as carefully as possible, digging out loose soil in the slopes, sloping the sides over as much as possible, trying to keep the hills made with the spoil back from the edge of the channel so their weight does not cause a cave-in and not excavating in a straight line. Below is an early picture of 2D coming to life, with some interesting if unmoved woodwork in the middle.
The new hills have been labelled and marked up on the map at the top of this blog. Some of them will be left blank to monitor natural regeneration. Some have been dibbled with seeds and propagules. And some have received test transplants from home. Over the course of this year I've been collecting seeds and growing them at home, to be able to watch their development. It has allowed me to experiment with various ideas, and look at tolerances. As I'm going on holiday Oct 22nd for a while, these mangroves are now being transported to the site - in some style, I might add.
Hill Y has received a pot of Rhizophora apiculata (above) from home, all of which had damaged buds. They have managed to recover from this early trauma and grow normally. Hill R has taken three Nypa fruticans palm plants. These are a species the local people use for their own livelihoods, so the site, once fully established, will have a good proportion of Nypa. These have been grown at home, and will be measured, monthly with the other hills that are monitored.
Two friends are visiting me from the UK. Over the weekend we will go to BLD and do the monthly measuring of all the plants being monitored. In the subsequent blog some of the initial data will be presented. In the meantime Rossi is back on his bike this weekend at Estorill, Portugal. Go Rossi!